Salar del Rincón
San Antonio de los Cobres
Salta - Argentina
From 2016 to the present
COMPLETED PROJECTS
→ Evaporation ponds 2017 10 hectares and 100,000 m3 of soil transportation; → Evaporation ponds 2018 30 hectares and 300,000 m3 of soil transportation; → Evaporation ponds 2022 20 hectares and 419,000 m3 of soil transportation; → Industrial warehouses Phase 1, industrial production 2021 - 2022 3,500 m2 of metal structures and 2,500 m3 of concrete; → Leveling and compaction of land 2018 10 hectares; → Internal road construction 2018 24 km;
→ Road construction in salt flat 2018 - 2019 20 km; → Olympic fencing 2021 30 hectares and 6 gates; → Mezzanine of H°A° 2021 600 m2; → Smoothed floors 2022 3500 m2; → Road construction in salt flat 21 km; → Internal roads construction 15 km; → Leveling and compaction of land 2023 21 hectáreas; → Salt harvesting from evaporation ponds 2020 - 2023 19 pools and 560,000 m3 of salt transportation; → Road maintenance → Pipe laying → Topography and engineering of evaporation ponds → Brine pipeline → Soil study. Compaction control. Laboratory Service.
RIO TINTO
Salar del Rincón
San Antonio de los Cobres
Salta - Argentina
2023 period
COMPLETED PROJECTS
Land leveling and compaction. 12 hectares
ERAMINE SUDAMERICA S.A.
San Antonio de los Cobres
Salta - Argentina
2023 period
COMPLETED PROJECTS
→ Road maintenance 220 km.
GANFENG LITHIUM
Salar de los Pozuelos
Salta - Argentina
2023 period
COMPLETED PROJECTS
→ Road construction in salt flat; → Land leveling; → Effluent ponds.